Wide view of the football field and surrounding seating at FIU Pitbull Stadium in Miami

Flagship project · Miami, Florida

FIU’s Pitbull Stadium. A flagship cleaning project.

600,000+ square feet. Completed in one week.

Project recordMiami, Florida

A stadium-wide scope.
One focused week.

Pressure Kleen Co. completed a cleaning and deck-painting project covering more than 600,000 square feet at Florida International University’s football stadium in Miami in one week. The scope extended from stadium seating and VIP suites to walkways, exterior surfaces and perimeter sidewalks.

All field work
Venue
FIU Football Stadium · Pitbull Stadium
Location
Miami, Florida
Project scale
600,000+ square feet
Completion time
One week

Project scope

The assignment

A working stadium is a landscape of surfaces, transitions and access routes. This project brought them into one coordinated scope.

01

Seating care, across the stadium.

The project included power washing, soft washing and disinfecting all stadium seating, together with mold and rust removal. The field photographs and seating-wash video show the crew working among the bleachers with cleaning equipment.

  • Power washing and soft washing of all stadium seating
  • Disinfecting all stadium seating
  • Mold removal and rust removal
02

From the stands to the stadium exterior.

Walkway cleaning, stadium exterior cleaning and perimeter sidewalk cleaning formed part of the same assignment. The gallery documents the stadium setting, concourse, access ramp, stairs and cleaning equipment on site.

  • Walkway cleaning
  • Stadium exterior cleaning
  • Perimeter sidewalk cleaning
03

Deck painting and VIP-suite softwashing.

The owner-confirmed scope also included painting decks and softwashing the VIP suites. These services belonged to the wider stadium assignment; the photographs are presented as project views, not a labeled before-and-after sequence.

  • Deck painting
  • VIP-suite softwashing

Field footage

A closer look around the stands.

Short, original project clips. Sound is intentionally muted.

01Seating cleaning in progressOriginal project footage showing cleaning work among the stadium bleachers.
02The stadium from field levelA field-level view of Pitbull Stadium and the surrounding seating.
03A view across the standsA short project clip looking across the FIU football stadium from the seating.

Project notes

A few useful details.

Call the team
What work did Pressure Kleen Co. complete at FIU’s football stadium?

The scope included power washing, soft washing and disinfecting all stadium seating; mold and rust removal; walkway, stadium exterior and perimeter sidewalk cleaning; deck painting; and VIP-suite softwashing.

How large was the FIU Pitbull Stadium project?

The project covered more than 600,000 square feet and took one week to complete. Those figures describe this specific stadium assignment.

Can a similar scope be planned for another stadium or facility?

Contact Pressure Kleen Co. with the property location, surfaces, approximate area, access requirements and preferred schedule. The team assesses each facility separately; this project’s one-week completion time is not a promise for another property.

For your property

A different site.
A scope built around it.

Every facility has its own surfaces, access requirements and operating rhythm. Share the essentials with Pressure Kleen Co. to start a practical conversation.