Project

Thermoplastic stripe removal at Memorial West.

Pressure Kleen Co. documented removal of 1,000 feet of thermoplastic striping at Memorial West Hospital.

Team and surface-preparation equipment during the Memorial West thermoplastic stripe-removal project
PROJECT

Project details

Removing existing striping

Project scope: 1,000 feet of thermoplastic stripes removed. The video still shows personnel and equipment on the concrete surface.

A historical project

This is a documented past scope, not a current line-striping or line-installation service offering.

More projects